FSU Spacer Pontoons
- 5 Vessels refurbed
- 98ton lift
- Technical hydraulic systems installed
Overview
The Challenge
To undertake a comprehensive repair and refurbishment programme, the pontoons were lifted out of the water to allow full access for underside inspection, preparation and the application of protective coating systems.
The existing hydraulic systems were heavily corroded, exposed to the elements and no longer operational. A full overhaul was therefore required to restore functionality, improve durability and ensure long-term reliability in the harsh marine environment.
Solution
Each 98-tonne pontoon was carefully lifted from the water and positioned within our compound on purpose-built pedestals, providing safe and unrestricted access to the underside for cleaning, preparation and coating applications. The refurbishment programme was delivered in phases, with one pontoon completed every three to four months to maintain operational continuity.
We designed and installed new stainless steel hydraulic systems complete with integrated containment measures, ensuring enhanced durability and environmental protection. In addition, the large stainless steel linkage rods were fully refurbished, restoring performance and extending the service life of the assemblies.