NMRN Lamination Bay

Designed, manufactured, and installed bespoke structural framework to the client’s specifications, achieving precise tolerances of ±1mm. Works included integration of an overhead gantry system to meet operational requirements.

  • Tight finish tolerances
  • Adjustable design for adaptability
  • Restricted height parameters

 

Client

Logo

Location

Portsmouth

Overview

We liaised with the client and reviewed the provided specifications to design a bespoke workstation to a tight tolerance of ±1mm. This enabled precise gluing of timber to form beam sections for use in the ongoing HMS Victory refurbishment, part of a seven-year works programme.

 

The Challenge

The biggest challenge was working with existing site levels to create a steel structure with a ±1mm tolerance, ensuring accuracy for forming timber beams. The design needed to be lightweight, adjustable to suit the client’s workflow, and capable of lifting up to 950kg at multiple points. Restricted headroom within the ‘glue shop’ further complicated installation, limiting the use of traditional methods and requiring innovative solutions.

 

Solution

To create a uniform site level for the central clamping glue station, we installed 12mm-thick tooling steel plates using countersunk resin fixings. The plates were carefully packed and grouted to achieve a level finish, allowing the new system to be securely bolted in place. This provided the client with flexibility to reposition clamp trestles for different projects as required.

The lamination bay was designed for full adjustability, with a series of holes on each post to enable glue stations to be adapted and moved as necessary. Overhead gantry hoists were installed in four locations along the length of the bay, giving the client sufficient lifting capacity and manoeuvrability for heavy timber beams.

All steelwork was installed efficiently and effectively by our installation team, meeting client requirements and delivering a system that enhances productivity and flexibility. The design of lamination bay was of full adjustability, with a series of holes on each post to enable glue stations to be adapted and moved as necessary. The overhead gantry hoists were installed across the length in 4 locations giving the clients sufficient lighting and manoeuvrability of heavy timber beams.

All steelwork was installed by our installation team efficiently and effectively to the satisfaction of client demands.

 

Working with MTECH, particularly Martin, has been a very smooth experience. Any questions raised—whether in face-to-face meetings or via email—are always answered promptly and professionally. When site visits to Portico were required, Martin was extremely helpful in arranging gate access and ensuring everyone had the correct security clearance and completed the training video. 

The refurbishment itself was carried out to a high standard, and site visits were always welcomed. The end user is very pleased with the addition of the new hydraulics, which significantly reduces manual handling. Overall, working with MTECH has been an excellent experience. 

KBS Maritime

Get in touch today

Have a project in mind? Get in touch with our team to discuss your requirements and discover how we can deliver safe, efficient, and high-quality solutions.

Get in touch
Ae78fbff5a90abdbbec77439d347b3a1a78c7cd6

Other projects

05

Plymouth CATS

Refurbishment of bespoke Plymouth CAT berthing fenders installed along the dockyard quay wall for Royal Navy vessels. Works included the installation of an in-house designed galvanised clamping system to secure the quay fenders and extend the service life of the supporting timber piles.

Read more
13

Semaphore Bridge

Refurbishment of a historic steel bridge supported by cylindrical piles, including structural steel repairs, bearing replacements, and installation of a new deck finish and balustrade. The project upgraded key components while preserving the bridge’s historic integrity.

Read more
IMG 3316

FSU Spacer Pontoons

Lift out and dry store vessels, carrying out comprehensive refurbishments and re-fit of stainless steel hydraulic pin locking systems. All necessary metalwork completed, and marine-grade paint systems applied throughout to ensure long-lasting performance in harsh environments.

Read more
DCIM100MEDIADJI 0361.JPG

Wightlink Fenders

Manufacture and installation of seven new ship-berthing pile fender units for Wightlink Ferries, delivered as part of a planned maintenance programme at Portsmouth’s busy ferry port. The works were carried out to enhance berth protection, improve operational reliability, and support the safe handling of high-frequency vessel movements.

Read more
20220818 113533

Pile 98

Removal of an existing ship navigation pile in Portsmouth Harbour and installation of a new dolphin piling at a precise location, complete with maintenance access and platform.

Read more
20250819 120115340 IOS

15 Dock Cassion

The 15 Dock Caisson is a vital asset for our client, facilitating safe and reliable access for vehicles, plant equipment, and pedestrians across the dry dock. Our scope of work involved the complete replacement of all surfaces and balustrades, ensuring enhanced safety and durability.

Read more
16 (1)

PRJ Lifting Platform

Bespoke made lifting platform to enable our client to lift various plant and vehicles onto Navy vessel safely and efficiently.

Read more