Plymouth CATS

Refurbishment of bespoke Plymouth CAT berthing fenders installed along the dockyard quay wall for Royal Navy vessels. Works included the installation of an in-house designed galvanised clamping system to secure the quay fenders and extend the service life of the supporting timber piles.

Client

Kbs Logo Header Removebg Preview

Location

Portsmouth

Overview

For this project, we were tasked with the refurbishment of bespoke Plymouth CAT ship berthing fender systems, used in conjunction with timber piling secured to the quay wall. To address deterioration and extend service life, we designed and manufactured galvanised steel clamps to restore structural integrity to splitting timber piles, ensuring long-term performance in the marine environment.

The Challenge

Developing a suitable design that addressed both the client’s budget constraints and the condition of the degrading timber piles proved challenging, particularly within the project timescale and site-specific working constraints.

Installation of the clamping units presented challenges due to below-water-level access. Through detailed planning, round-the-clock working, and close coordination with diving contractors, the works were successfully completed within the required timeframe while managing tidal movements.

Solution

The design solution comprised 8m-long folded steel plate sections with welded gussets for structural integrity, bolted back-to-back to form a clamp-like structure. All components were manufactured in-house and hot-dip galvanised to provide a durable marine-grade coating. Smaller clamp sections were also fabricated and installed along the length of the fender system below the waterline.

Through detailed planning and the use of heavy marine equipment, including multi-cat work barges and plant machinery, we completed the works on schedule, preparing the site for the installation of the newly refurbished Plymouth CAT berthing fenders from our contractor’s shipyard.

Using the ship lift to remove the berthing fenders allowed us to carry out a complete overhaul to a high standard. Each fender was surveyed and discussed with the client to determine the required works. All ancillary items were removed, new marine-grade paint systems applied, and replacement components installed where necessary. Upon completion, each fender was lifted back into the water and reinstalled alongside our newly installed piling-sleeve timber piles along the quay edge.

Working with MTECH, particularly Martin, has been a very smooth experience. Any questions raised—whether in face-to-face meetings or via email—are always answered promptly and professionally. When site visits to Portico were required, Martin was extremely helpful in arranging gate access and ensuring everyone had the correct security clearance and completed the training video. 

The refurbishment itself was carried out to a high standard, and site visits were always welcomed. The end user is very pleased with the addition of the new hydraulics, which significantly reduces manual handling. Overall, working with MTECH has been an excellent experience. 

KBS Maritime

Get in touch today

Have a project in mind? Get in touch with our team to discuss your requirements and discover how we can deliver safe, efficient, and high-quality solutions.

Get in touch
Ae78fbff5a90abdbbec77439d347b3a1a78c7cd6

Other projects

13

Semaphore Bridge

Refurbishment of a historic steel bridge supported by cylindrical piles, including structural steel repairs, bearing replacements, and installation of a new deck finish and balustrade. The project upgraded key components while preserving the bridge’s historic integrity.

Read more
IMG 3316

FSU Spacer Pontoons

Lift out and dry store vessels, carrying out comprehensive refurbishments and re-fit of stainless steel hydraulic pin locking systems. All necessary metalwork completed, and marine-grade paint systems applied throughout to ensure long-lasting performance in harsh environments.

Read more
DCIM100MEDIADJI 0361.JPG

Wightlink Fenders

Manufacture and installation of seven new ship-berthing pile fender units for Wightlink Ferries, delivered as part of a planned maintenance programme at Portsmouth’s busy ferry port. The works were carried out to enhance berth protection, improve operational reliability, and support the safe handling of high-frequency vessel movements.

Read more
06

NMRN Lamination Bay

Designed, manufactured, and installed bespoke structural framework to the client’s specifications, achieving precise tolerances of ±1mm. Works included integration of an overhead gantry system to meet operational requirements.

Read more
20220818 113533

Pile 98

Removal of an existing ship navigation pile in Portsmouth Harbour and installation of a new dolphin piling at a precise location, complete with maintenance access and platform.

Read more
20250819 120115340 IOS

15 Dock Cassion

The 15 Dock Caisson is a vital asset for our client, facilitating safe and reliable access for vehicles, plant equipment, and pedestrians across the dry dock. Our scope of work involved the complete replacement of all surfaces and balustrades, ensuring enhanced safety and durability.

Read more
16 (1)

PRJ Lifting Platform

Bespoke made lifting platform to enable our client to lift various plant and vehicles onto Navy vessel safely and efficiently.

Read more