DCIM100MEDIADJI 0361.JPG

Wightlink Fenders

Manufacture and installation of seven new ship-berthing pile fender units for Wightlink Ferries, delivered as part of a planned maintenance programme at Portsmouth’s busy ferry port. The works were carried out to enhance berth protection, improve operational reliability, and support the safe handling of high-frequency vessel movements.

Client

1791397ccffb495a11864071cf9d661a2eb021da

Location

Portsmouth, Gunwharf

Overview

In this project, we were tasked with manufacturing and installing seven new ship berthing pile fender units, each weighing 12 tonnes and measuring approximately 22 metres in length. All existing piles were removed and disposed of, with the new piles reinstated in their original seabed positions.

The Challenge

The project presented numerous challenges, from manufacturing to installation, while working to strict deadlines. Our client, Wightlink Ferries, operates a busy ferry service between Portsmouth and the Isle of Wight around the clock, seven days a week. These works were critical to ensuring their operations could continue uninterrupted for years to come.

The biggest challenge was the installation of all seven fender units within the tight seven-day timeframe.

The removal of the existing fendering system was particularly challenging due to the unknown extent of seabed embedment and the pulling forces required to extract each pile.

Solution

Our team meticulously planned and managed every stage of the project to anticipate potential delays and ensure the works were completed on schedule.

The installation team worked around the clock for six days, maintaining a high standard of work while managing noise restrictions during the night to minimise disruption to nearby public dwellings.

To extract the existing piling fenders, we designed and installed a bespoke pulling rig on a seaworthy work barge. Used in conjunction with 60-tonne compressed-air pulling rigs, this setup provided safe, controlled, and flexible extraction of each pile from the seabed, ensuring the works could be completed efficiently and securely.

We have had the pleasure of working with Mtech on a range of Engineering and marine civil engineering projects as well as reactive maintenance tasks, and their performance has been nothing short of exceptional. From the outset, their team demonstrated a deep understanding of the complexities involved in marine environments, delivering innovative solutions tailored to each challenge. 

The quality of their workmanship is consistently outstanding. Every project has been completed to the highest standards, with meticulous attention to detail and a clear commitment to durability and safety. Their ability to respond quickly and effectively to reactive maintenance needs has been invaluable, minimising downtime and ensuring operations continue smoothly. 

What truly sets Mtech apart is their proactive approach and problem-solving mindset. They don’t just meet expectations—they exceed them, offering practical, cost-effective solutions without compromising on quality. Communication throughout each project has been clear and professional, making collaboration effortless. 

We highly recommend Mtech to anyone seeking a reliable, skilled, and forward-thinking engineering supply partner. Their expertise and dedication make them an asset to any project and supply list. 

Jonathan Brace, Wightlink Ferries  

Get in touch today

Have a project in mind? Get in touch with our team to discuss your requirements and discover how we can deliver safe, efficient, and high-quality solutions.

Get in touch
Ae78fbff5a90abdbbec77439d347b3a1a78c7cd6

Other projects

05

Plymouth CATS

Refurbishment of bespoke Plymouth CAT berthing fenders installed along the dockyard quay wall for Royal Navy vessels. Works included the installation of an in-house designed galvanised clamping system to secure the quay fenders and extend the service life of the supporting timber piles.

Read more
13

Semaphore Bridge

Refurbishment of a historic steel bridge supported by cylindrical piles, including structural steel repairs, bearing replacements, and installation of a new deck finish and balustrade. The project upgraded key components while preserving the bridge’s historic integrity.

Read more
IMG 3316

FSU Spacer Pontoons

Lift out and dry store vessels, carrying out comprehensive refurbishments and re-fit of stainless steel hydraulic pin locking systems. All necessary metalwork completed, and marine-grade paint systems applied throughout to ensure long-lasting performance in harsh environments.

Read more
06

NMRN Lamination Bay

Designed, manufactured, and installed bespoke structural framework to the client’s specifications, achieving precise tolerances of ±1mm. Works included integration of an overhead gantry system to meet operational requirements.

Read more
20220818 113533

Pile 98

Removal of an existing ship navigation pile in Portsmouth Harbour and installation of a new dolphin piling at a precise location, complete with maintenance access and platform.

Read more
20250819 120115340 IOS

15 Dock Cassion

The 15 Dock Caisson is a vital asset for our client, facilitating safe and reliable access for vehicles, plant equipment, and pedestrians across the dry dock. Our scope of work involved the complete replacement of all surfaces and balustrades, ensuring enhanced safety and durability.

Read more
16 (1)

PRJ Lifting Platform

Bespoke made lifting platform to enable our client to lift various plant and vehicles onto Navy vessel safely and efficiently.

Read more